ログイン
言語:

WEKO3

  • トップ
  • ランキング
To
lat lon distance
To

Field does not validate



インデックスリンク

インデックスツリー

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

  1. 03 経営学部
  2. 3-1 学術雑誌論文

The Benefits and Constraints of Temporary Sourcing Diversification in Supply Chain Disruption and Recovery

http://hdl.handle.net/10131/9037
http://hdl.handle.net/10131/9037
f0db5fc9-d61c-4deb-9969-81679e0c97d5
名前 / ファイル ライセンス アクション
Riken_JPSM_20140521_Rev3_5.pdf Riken_JPSM_20140521_Rev3_5.pdf (403.5 kB)
Item type 学術雑誌論文 / Journal Article(1)
公開日 2015-03-03
タイトル
タイトル The Benefits and Constraints of Temporary Sourcing Diversification in Supply Chain Disruption and Recovery
言語 en
言語
言語 eng
キーワード
主題 Supply chain disruption, disaster, risk management, temporary diversification, single-sourcing, product specificity(en)
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_6501
資源タイプ journal article
アクセス権
アクセス権 open access
アクセス権URI http://purl.org/coar/access_right/c_abf2
著者 Whitney, Daniel E.

× Whitney, Daniel E.

en Whitney, Daniel E.
Engineering Systems Division, Massachusetts Institute of Technology

Search repository
Luo, Jianxi

× Luo, Jianxi

en Luo, Jianxi
Engineering Product Development Pillar, Singapore University of Technology and Design

Search repository
Heller, Daniel A.

× Heller, Daniel A.

en Heller, Daniel A.
College of Business Administration,Yokohama National University

Search repository
抄録
内容記述タイプ Abstract
内容記述 Sourcing diversification is the preferred hedge to supply chain disruption risks, but many companies insist on single-sourcing for long-term strategic benefits. For rare-but-catastrophic disruptions of fortified supply chains, temporary sourcing diversification has been seen as a desirable response strategy. However, little is known about the conditions to temporary sourcing diversification and the situations where it is applicable. Our fieldwork and comparison of two disaster recoveries at Aisin Seiki and Riken Corporation shows that while temporary sourcing diversification worked in the Aisin Seiki case, it was impossible at Riken due to the high degree of specificity required in the design and manufacturing methods of the disrupted product item, suggesting product and process specificity limit recovery alternatives. Unawareness of such constraints to temporary sourcing diversification may result in over-optimism regarding its feasibility and insufficient disaster preparedness. In addition, the case of Riken’s recovery from an earthquake in 2007 is systematically documented in this paper for the first time.
言語 en
bibliographic_information en : Journal of Purchasing & Supply Management

巻 20, 号 4, p. 238-250, ページ数 13, 発行日 2014-12
item_2_source_id_9
収録物識別子タイプ PISSN
収録物識別子 14784092
item_2_source_id_11
収録物識別子タイプ NCID
収録物識別子 AA11857511
出版タイプ
出版タイプ AM
出版タイプResource http://purl.org/coar/version/c_ab4af688f83e57aa
出版者
出版者 Elsevier
戻る
0
views
See details
Views

Versions

Ver.1 2023-06-20 19:24:22.078175
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3