WEKO3
アイテム
{"_buckets": {"deposit": "b32742db-1024-467b-976a-e676d01c0623"}, "_deposit": {"created_by": 3, "id": "2196", "owners": [3], "pid": {"revision_id": 0, "type": "depid", "value": "2196"}, "status": "published"}, "_oai": {"id": "oai:ynu.repo.nii.ac.jp:00002196", "sets": ["363"]}, "author_link": ["10647", "10650", "10648", "10649"], "item_2_biblio_info_8": {"attribute_name": "書誌情報", "attribute_value_mlt": [{"bibliographicIssueDates": {"bibliographicIssueDate": "2014-12", "bibliographicIssueDateType": "Issued"}, "bibliographicIssueNumber": "4", "bibliographicPageEnd": "250", "bibliographicPageStart": "238", "bibliographicVolumeNumber": "20", "bibliographic_titles": [{"bibliographic_title": "Journal of Purchasing \u0026 Supply Management"}]}]}, "item_2_description_5": {"attribute_name": "抄録", "attribute_value_mlt": [{"subitem_description": "Sourcing diversification is the preferred hedge to supply chain disruption risks, but many companies insist on single-sourcing for long-term strategic benefits. For rare-but-catastrophic disruptions of fortified supply chains, temporary sourcing diversification has been seen as a desirable response strategy. However, little is known about the conditions to temporary sourcing diversification and the situations where it is applicable. Our fieldwork and comparison of two disaster recoveries at Aisin Seiki and Riken Corporation shows that while temporary sourcing diversification worked in the Aisin Seiki case, it was impossible at Riken due to the high degree of specificity required in the design and manufacturing methods of the disrupted product item, suggesting product and process specificity limit recovery alternatives. Unawareness of such constraints to temporary sourcing diversification may result in over-optimism regarding its feasibility and insufficient disaster preparedness. In addition, the case of Riken’s recovery from an earthquake in 2007 is systematically documented in this paper for the first time.", "subitem_description_type": "Abstract"}]}, "item_2_full_name_2": {"attribute_name": "著者(ヨミ)", "attribute_value_mlt": [{"nameIdentifiers": [{"nameIdentifier": "10650", "nameIdentifierScheme": "WEKO"}], "names": [{"name": "ヘラー, ダニエル"}]}]}, "item_2_source_id_11": {"attribute_name": "書誌レコードID", "attribute_value_mlt": [{"subitem_source_identifier": "AA11857511", "subitem_source_identifier_type": "NCID"}]}, "item_2_source_id_9": {"attribute_name": "ISSN", "attribute_value_mlt": [{"subitem_source_identifier": "14784092", "subitem_source_identifier_type": "ISSN"}]}, "item_2_text_4": {"attribute_name": "著者所属", "attribute_value_mlt": [{"subitem_text_value": "Engineering Systems Division, Massachusetts Institute of Technology"}, {"subitem_text_value": "Engineering Product Development Pillar, Singapore University of Technology and Design"}, {"subitem_text_value": "College of Business Administration,Yokohama National University"}]}, "item_2_version_type_18": {"attribute_name": "著者版フラグ", "attribute_value_mlt": [{"subitem_version_resource": "http://purl.org/coar/version/c_ab4af688f83e57aa", "subitem_version_type": "AM"}]}, "item_creator": {"attribute_name": "著者", "attribute_type": "creator", "attribute_value_mlt": [{"creatorNames": [{"creatorName": "Whitney, Daniel E."}], "nameIdentifiers": [{"nameIdentifier": "10647", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Luo, Jianxi"}], "nameIdentifiers": [{"nameIdentifier": "10648", "nameIdentifierScheme": "WEKO"}]}, {"creatorNames": [{"creatorName": "Heller, Daniel A."}], "nameIdentifiers": [{"nameIdentifier": "10649", "nameIdentifierScheme": "WEKO"}]}]}, "item_files": {"attribute_name": "ファイル情報", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_date", "date": [{"dateType": "Available", "dateValue": "2016-09-15"}], "displaytype": "detail", "download_preview_message": "", "file_order": 0, "filename": "Riken_JPSM_20140521_Rev3_5.pdf", "filesize": [{"value": "403.5 kB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_free", "mimetype": "application/pdf", "size": 403500.0, "url": {"label": "Riken_JPSM_20140521_Rev3_5.pdf", "url": "https://ynu.repo.nii.ac.jp/record/2196/files/Riken_JPSM_20140521_Rev3_5.pdf"}, "version_id": "fd9d9572-6727-48fb-a3f8-1dfef23a03e2"}]}, "item_keyword": {"attribute_name": "キーワード", "attribute_value_mlt": [{"subitem_subject": "Supply chain disruption", "subitem_subject_scheme": "Other"}, {"subitem_subject": "disaster", "subitem_subject_scheme": "Other"}, {"subitem_subject": "risk management", "subitem_subject_scheme": "Other"}, {"subitem_subject": "temporary diversification", "subitem_subject_scheme": "Other"}, {"subitem_subject": "single-sourcing", "subitem_subject_scheme": "Other"}, {"subitem_subject": "product specificity", "subitem_subject_scheme": "Other"}, {"subitem_subject": "asset specificity", "subitem_subject_scheme": "Other"}, {"subitem_subject": "case studies", "subitem_subject_scheme": "Other"}]}, "item_language": {"attribute_name": "言語", "attribute_value_mlt": [{"subitem_language": "eng"}]}, "item_resource_type": {"attribute_name": "資源タイプ", "attribute_value_mlt": [{"resourcetype": "journal article", "resourceuri": "http://purl.org/coar/resource_type/c_6501"}]}, "item_title": "The Benefits and Constraints of Temporary Sourcing Diversification in Supply Chain Disruption and Recovery", "item_titles": {"attribute_name": "タイトル", "attribute_value_mlt": [{"subitem_title": "The Benefits and Constraints of Temporary Sourcing Diversification in Supply Chain Disruption and Recovery"}]}, "item_type_id": "2", "owner": "3", "path": ["363"], "permalink_uri": "http://hdl.handle.net/10131/9037", "pubdate": {"attribute_name": "公開日", "attribute_value": "2015-03-03"}, "publish_date": "2015-03-03", "publish_status": "0", "recid": "2196", "relation": {}, "relation_version_is_last": true, "title": ["The Benefits and Constraints of Temporary Sourcing Diversification in Supply Chain Disruption and Recovery"], "weko_shared_id": 3}
The Benefits and Constraints of Temporary Sourcing Diversification in Supply Chain Disruption and Recovery
http://hdl.handle.net/10131/9037
http://hdl.handle.net/10131/9037f0db5fc9-d61c-4deb-9969-81679e0c97d5
名前 / ファイル | ライセンス | アクション |
---|---|---|
Riken_JPSM_20140521_Rev3_5.pdf (403.5 kB)
|
|
Item type | 学術雑誌論文 / Journal Article(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2015-03-03 | |||||
タイトル | ||||||
タイトル | The Benefits and Constraints of Temporary Sourcing Diversification in Supply Chain Disruption and Recovery | |||||
言語 | ||||||
言語 | eng | |||||
キーワード | ||||||
主題 | Supply chain disruption, disaster, risk management, temporary diversification, single-sourcing, product specificity, asset specificity, case studies | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_6501 | |||||
資源タイプ | journal article | |||||
著者 |
Whitney, Daniel E.
× Whitney, Daniel E.× Luo, Jianxi× Heller, Daniel A. |
|||||
著者(ヨミ) | ||||||
識別子Scheme | WEKO | |||||
識別子 | 10650 | |||||
姓名 | ヘラー, ダニエル | |||||
著者所属 | ||||||
Engineering Systems Division, Massachusetts Institute of Technology | ||||||
著者所属 | ||||||
Engineering Product Development Pillar, Singapore University of Technology and Design | ||||||
著者所属 | ||||||
College of Business Administration,Yokohama National University | ||||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | Sourcing diversification is the preferred hedge to supply chain disruption risks, but many companies insist on single-sourcing for long-term strategic benefits. For rare-but-catastrophic disruptions of fortified supply chains, temporary sourcing diversification has been seen as a desirable response strategy. However, little is known about the conditions to temporary sourcing diversification and the situations where it is applicable. Our fieldwork and comparison of two disaster recoveries at Aisin Seiki and Riken Corporation shows that while temporary sourcing diversification worked in the Aisin Seiki case, it was impossible at Riken due to the high degree of specificity required in the design and manufacturing methods of the disrupted product item, suggesting product and process specificity limit recovery alternatives. Unawareness of such constraints to temporary sourcing diversification may result in over-optimism regarding its feasibility and insufficient disaster preparedness. In addition, the case of Riken’s recovery from an earthquake in 2007 is systematically documented in this paper for the first time. | |||||
書誌情報 |
Journal of Purchasing & Supply Management 巻 20, 号 4, p. 238-250, 発行日 2014-12 |
|||||
ISSN | ||||||
収録物識別子タイプ | ISSN | |||||
収録物識別子 | 14784092 | |||||
書誌レコードID | ||||||
収録物識別子タイプ | NCID | |||||
収録物識別子 | AA11857511 | |||||
著者版フラグ | ||||||
出版タイプ | AM | |||||
出版タイプResource | http://purl.org/coar/version/c_ab4af688f83e57aa |